LNG Breakbulk Terminal at Yukon harbor operational

At the new Yukon Harbor on the north side of the Yangtze Canal in the Port of Rotterdam the first LNG ships and Bunker Ships have moored to load modest amounts of liquefied natural gas.

In collaboration with both consultant and port authority QuayQuip proposed a test protocol for durability testing of the QCY QCY ø 1000/500 x 1500 Cylindrical fenders we supplied.

All equipment we supplied (fenders, bollards, sliding fenders and safety ladders) is successfully installed and all in full operation.


Leave a Reply

Your email address will not be published. Required fields are marked *